Strategi Pencegahan Keterlambatan Proses Crew Change pada Armada Kapal PT. Satrya Maritim Indonesia

Authors

  • Raden Rendy Arman Politeknik Pelayaran Barombong
  • Markus Asta Patma Nugraha Politeknik Pelayaran Barombong
  • Irwan Jaya Politeknik Pelayaran Barombong
  • Julita A. Gani Politeknik Pelayaran Barombong
  • Muhammad Yusuf Politeknik Pelayaran Barombong

DOI:

https://doi.org/10.61759/hmj.v7i1.123

Keywords:

Strategy, Delay, Crew Change

Abstract

This research aims to analyze the factors causing delays in crew changes on the vessel fleet of PT. Satrya Maritim Indonesia and to formulate preventive strategies. The problem arose from cases of delayed crew rotations in the operational area of Brunei Darussalam, which resulted in client-imposed sanctions. The research method applied was qualitative descriptive, using observation, interviews, and documentation during the internship, as well as comparative analysis between field findings and crew management theories. The results indicate that delays were triggered by internal factors such as limited standby crew availability, irregular planning, weak interdepartmental coordination, and administrative errors, as well as external factors such as visa processing delays, changes in immigration policies, transportation disruptions due to weather, and specific client requirements. The recommended preventive strategies include the development of a structured timeline, strengthening the database and monitoring of both standby and former crew, regular recruitment, improved internal and external coordination, utilization of a crew management system, adjustment of rotation patterns, and continuous evaluation. In conclusion, preventing delays should focus on the synergy between human resource management, administrative planning, and compliance with destination country regulations in order to minimize risks of delays, enhance operational efficiency, and maintain client satisfaction.

 

ABSTRAK

Penelitian ini bertujuan menganalisis faktor penyebab keterlambatan crew change pada armada kapal PT. Satrya Maritim Indonesia dan merumuskan strategi pencegahannya. Permasalahan berawal dari kasus keterlambatan rotasi kru di wilayah operasi Brunei Darussalam yang berujung pada sanksi dari klien. Metode penelitian menggunakan deskriptif kualitatif melalui observasi, wawancara, dan dokumentasi selama praktik kerja, serta analisis perbandingan antara temuan lapangan dan teori manajemen kru. Hasil menunjukkan keterlambatan dipicu faktor internal seperti keterbatasan jumlah standby crew, ketidakteraturan perencanaan, lemahnya koordinasi antardepartemen, dan kesalahan administratif, serta faktor eksternal seperti keterlambatan pengurusan visa, perubahan kebijakan imigrasi, hambatan transportasi akibat cuaca, dan permintaan khusus klien. Strategi pencegahan yang direkomendasikan meliputi penyusunan timeline terstruktur, penguatan database dan monitoring kru standby maupun eks kru, rekrutmen berkala, peningkatan koordinasi internal-eksternal, pemanfaatan crew management system, penyesuaian pola rotasi, dan evaluasi berkelanjutan. Kesimpulannya, pencegahan keterlambatan harus berfokus pada sinergi manajemen sumber daya manusia, perencanaan administratif, dan kepatuhan regulasi negara tujuan guna meminimalkan risiko keterlambatan, meningkatkan efisiensi operasional, serta menjaga kepuasan klien.

References

Fairbanks, M., & Buchko, A. (2018). Performance and Strategy for Organizational Success. New York: Routledge.

Gravetter, F. J., & Forzano, L. B. (2018). Research Methods for the Behavioral Sciences. Boston: Cengage Learning.

Hage, S. M., & Iellamo, A. D. (2024). Preventive Strategies in Crisis Management. Geneva: International Safety Organization.

IMO. (2010). International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (STCW). London: International Maritime Organization.

ISO. (2015). Quality Management Systems – Fundamentals and Vocabulary (ISO 9000:2015). Geneva: International Organization for Standardization.

Kamus Besar Bahasa Indonesia (KBBI) Daring. https://kbbi.kemdikbud.go.id.

Kurniawan, A. (2020). Pengantar Ilmu Kapal dan Klasifikasinya. Jakarta: Penerbit Bahari Nusantara.

Kurniawan, L. A. (2017). Analisis Keterlambatan Pengiriman Crew Kapal pada saat Sign On di PT. Pertamina Perkapalan Jakarta (Skripsi). Jakarta: Universitas Trisakti.

Luthfiansyah, A. (2017). Manajemen Armada Offshore Supply Vessel. Jakarta: Penerbit Maritim Indonesia.

Lynch, R. (2018). Strategic Management. Harlow: Pearson Education.

Nagata, M., Sugiura, Y., & Yamamoto, T. (2018). Delay Analysis in Project Scheduling. Tokyo: Springer Japan.

Nur Afif, A. S. (2021). Strategi Pencegahan Keterlambatan Crew On Board dalam Pergantian Crew Kapal pada Masa Pandemi Covid-19 di PT. Jasindo Duta Segara (Skripsi). Semarang: Politeknik Ilmu Pelayaran Semarang. https://repository.pip-semarang.ac.id/1346/.

Siagian, S. P. (2004). Manajemen Strategik. Jakarta: Bumi Aksara.

Sofyan, A. S. N. (2021). Strategi Pencegahan Keterlambatan Crew On Board dalam Pergantian Crew Kapal pada Masa Pandemi Covid-19 di PT. Jasindo Duta Segara (Skripsi). Semarang: Politeknik Ilmu Pelayaran Semarang.

Study on Time Delay Analysis. (2022). Comprehensive Methods for Delay Evaluation in Maritime Projects. Singapore: Maritime Research Institute.

Sukandarrumidi. (2006). Metodologi Penelitian. Yogyakarta: Gadjah Mada University Press.

Sugiyono. (2015). Metode Penelitian Pendidikan: Pendekatan Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta.

Sundarti, & Dekanawati, V. (2020). Analisa Rekrutmen, Seleksi dan Penempatan Kru terhadap Kinerja Kru Kapal di PT. MCS International Jakarta. Jurnal Manajemen Transportasi, 5(2), 45–55. https://ejournal.stipjakarta.ac.id/index.php/jmt/article/view/99

Taherdoost, H. (2018). Sampling Methods in Research Methodology; How to Choose a Sampling Technique for Research. SSRN Electronic Journal. https://ssrn.com/abstract=3205035

Undang-Undang Republik Indonesia Nomor 17 Tahun 2008 tentang Pelayaran.

Downloads

Published

2026-03-31

How to Cite

Arman, R. R., Nugraha, M. A. P., Jaya, I., Gani, J. A., & Yusuf, M. (2026). Strategi Pencegahan Keterlambatan Proses Crew Change pada Armada Kapal PT. Satrya Maritim Indonesia. Hengkara Majaya, 7(1), 20–27. https://doi.org/10.61759/hmj.v7i1.123

Issue

Section

Articles